Bio-climatic building
|
Location: Milan
Year 2010 Team: Arch.Manuele Mossoni Arch. Fabio De Ciechi Arch. Carlo Gallelli |
Project layout
The restatement involves several interventions with the main objective to improve the performance of the building. Some interventions relate to the transformation of the building and its parts dull, while others are intended for implementation of production systems (hot water, electricity, heating / cooling). The morphological changes concern the inclusion in the building facade facing south east of the greenhouses solar capture. This system consists of a collection solar facade system facing south - east. We sought the optimal exposure for most uptake of the transparent elements . Such elements are fixed to the existing floor , greenhouses are the extension of the balconies. For the production of electricity was provided a gridconnected photovoltaic system, with panels in monocrystalline silicon. The system is semi integrated in coverage through a structure of steel profiles. This system provides the perfect angle and therefore an efficient system. The system provides electricity to utilities and heating / cooling. Inside were provided thermal solar panels for producing hot water. It is estimated that production of electricity is 35% respect to the entire energy requirements.Was provided a system Ground Source Heat Pumps, the main problem is the lack of open area to run a system like this. It is thought to localize the system in front of the building. The area has been recently rebuilt, and is represented by a small green park, this appears to be an excellent location for the system. We have chosen to use a horizontal system for its economy at the expense of a great demand for underground. This type of system is suitable for small buildings, the system is directly connected to a heat pump placed in the basement of the building. The energy requirements necessary for the operation is produced by the photovoltaic system on the roof.